Results 1 to 10 of 14

Thread: Doser Gen 1

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    02.01.2011
    Location
    Brisbane, Australia
    Posts
    92

    Default

    Quote Originally Posted by Gunther View Post
    • Dosing pump unit with 1, 2, 3 or 4 dosing pumps
    • AC/DC adapter
    • Cable with westen plug RJ12 (6 lines)



    A RJ12 phone cable (ensure it has 6 wires, RJ11 with 6pin socket and 4 wires doesn´t work)


    S1-4 (or, if you have a PL3 also S5-S8 is possible)


    You haven´t told us which PL you have. In any case it depends on your device, the firmware version and the software you use (ProfiluxControl for PLII and GHL Control Center for newer firmware releases of PL3)
    Best is to have a look into the Programming guide of your Profilux computer



    Yes, it´s stand-alone only. There is no possibility to connect a Doser 1 SA to a Profilux
    It´s simple to check that: The SA version has a display, the slave unit has not.
    Thank you Gunter!

    I have a P3e controller.

    At the back of the doser are 2 x RJ jacks, which one is connected to the P3e?

    What about the power adaptor, is there any special requirement for its location or can it be plugged into a remote power socket or must it be plugged into a power bar ? I have 2 x digital power bars, how should the socket be set up?

    Thank you in anticipation.

  2. #2
    Join Date
    06.02.2012
    Posts
    2,020

    Default

    At the back of the doser are 2 x RJ jacks, which one is connected to the P3e?
    It doesn´t matter, take one of them. It´s the same as with the power bars.

    What about the power adaptor, is there any special requirement for its location or can it be plugged into a remote power socket or must it be plugged into a power bar?
    Due it doesn´t make sense to have it switched , put it into an un-switched socket apart from the power bars

    I have 2 x digital power bars, how should the socket be set up?
    As said: Use an un-switched one.

    Remark: The doser is reacts to socket 1-4 if you use S1S4 and to socket 25-28 if you use S5S8 by default.
    If you want to change that, unplug the powerbars, plug it into one of the S-socket you want to use (it has to be alone on this socket), change the S-socket to digital and program the doser numbers you want
    Programming is similar to the powerbar programming.
    If you have done so (switched to digital) it´s possible to daisy-chain the doser with the powerbars.
    Ensure that a socket number is not given to two different devices.

  3. #3
    Join Date
    02.01.2011
    Location
    Brisbane, Australia
    Posts
    92

    Default

    Thanks, Gunter!

  4. #4
    Join Date
    02.01.2011
    Location
    Brisbane, Australia
    Posts
    92

    Default

    I have decided to use S5-S8 on the PAB (P3eX).

    My process:
    (1) Connect power to doser
    (2) Enable digital power bars for S5-S8
    (3) Plug the doser into the socket S5-S8
    (4) Access numbering of pumps and default outputs 25-28 is greyed out and not adjustable
    (5) Leave all pumps numbering as default
    (6) Access programming:
    -- Must the power bar attached to S1-4 be disconnected or can it stay connected?
    (7) Leaving S1-4 connected ... select 'program now' and get communication error 50

    How do I proceed from here, please? What is com error 50?

    Thank you in anticipation.

  5. #5
    Join Date
    27.05.2015
    Posts
    2,492

    Default

    1. Go to the Switch channels and outlets settings page and activate the S5-S8 socket. Click YES to activate, then save settings. The Program digital powerbar... button will no longer be greyed out.
    Enable S5-S8 socket.JPG
    2. Disconnect all devices connected to the S1-S4 port. Only the device that will be getting programmed should be connected. In this case, nothing should be connected to the S1-S4 and only the doser should be connected to the S5-S8 port.
    3. Click on the Program digital powerbar... button, select Numbering of a dosing pump.... Numbering will automatically begin at S25 since it is connected to the S5-S8 port, click NEXT, click PROGRAM NOW, then READY.
    Gen 1 Doser pump numbering.JPG
    4. In the Switch channels and outlets settings page, go to S25-S28 and assign the functions to Dosing pump. If this is your first dosing pump unit, set the S25 function to Dosing Pump 1, S 26 to Dosing Pump 2, etc. Save your settings.
    Assigning to Socket Channels.JPG
    5. Go to the respective dosing pump channels and create your dosing pump schedules. Save changes.

  6. #6
    Join Date
    02.01.2011
    Location
    Brisbane, Australia
    Posts
    92

    Default

    Cheers, Vinny!

    All done!

  7. #7
    Join Date
    02.01.2011
    Location
    Brisbane, Australia
    Posts
    92

    Default

    Problem !

    I can get the unit to run when I use the 3m GHL RJ12 cable but when use a 10m RJ12 cable so that I can locate the dosing unit in the right location, there is no communication between the P3eX and the dosing unit.

    Is the length of cable an issue?

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •