Results 1 to 10 of 11

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #10
    Join Date
    13.10.2014
    Posts
    45

    Default

    Quote Originally Posted by balloonpilot View Post
    Yes, however I would prefer to have ATO run as needed and not wait for a specific time
    But that introduces more chance for failure. You can have multiple event starts for ATO 12, 3, 6, 9, etc. Then you can limit ATO max-time to 1 minute or 2 minutes.

    For AWC you can have it longer like 15 minutes.
    Last edited by Raul-7; 21.01.2015 at 21:43.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •