in this case all Mitras LX are slaves (the ProfiLux with expansion card PLM-PWC is the master), so the delay must be set in all lamps

e.g.

lamp #1 (left) delay = 0s
lamp #2 delay = 3s
lamp #3 (right) delay = 6s


-> within 6s the cloud will move from the left to the right