The P4 transmits the simulation functions to each LX7 via the PWC card. The light addressing only has to do with the LX7.

In the case of the LB2, this is done through the Mitras Lightbar cable that connects to the RJ45 port. When a simulation is enabled, the data is transmitted to the LB2 through the LB2-cable.