Forgive me if covered elsewhere.
I would like to automate liquid feeding via dosing pumps- I'm not sure how to schedule this:
Firstly at say 8pm a feed pause is to be activated -(which stops return pumps and minimises pumps within tank. Also via program logic it stops & delays on the skimmer, the bit in brackets I know!)
Secondly when the water level has dropped in main tank ( because return pump is off and water level dropping an inch over weir into the sump-taking about 90 seconds) So I therefore want to schedule the dosing to start say 120 seconds after the feed-pause was scheduled.

Can someone help?

I suppose the problem is either how do I schedule a feed pause because if this is possible just do it 2 mins before dosing time
or can you set up a feed pause within a timed event
Mike