Results 1 to 3 of 3

Thread: "Delayed On" function for digital powerbar sockets

  1. #1
    Join Date
    17.08.2009
    Posts
    132

    Default "Delayed On" function for digital powerbar sockets

    One thing that I am always struggling with is how the profilux automatically starts up sockets designated as "Filter" as soon as power is restored following an outage. When this happens the water level in my sump is generally much higher then it usually is so it causes my skimmer to overflow from the extra water.

    I would "love" to have a programmable option for a delayed start on a socket when the unit powers on. For example:

    My skimmer uses 3 x Sedra 9000 pumps, for this example they will be plugged in to Sockets 1 through 3.

    During Power on Socket 1 starts automatically.
    Socket 2 Starts 1 minute later
    Socket 3 Starts 2 minutes later

    With this configuration the time delay between sockets starting up allows the height of water in the skimmer to rise slowly and balance out before starting additional pumps.

    Just a thought, as it would make my life easier, and keep my floors a lot drier during power outage season!

  2. #2
    Join Date
    18.02.2009
    Location
    Kaiserslautern
    Posts
    7,710

    Default

    this function is already available - a "Blackout delay" for each socket can be adjusted

  3. #3
    Join Date
    28.02.2009
    Posts
    28

    Default

    Quote Originally Posted by Matthias View Post
    this function is already available - a "Blackout delay" for each socket can be adjusted
    In 4.05 version this is working only in case of power failure but there is not delay after exiting maintenance mode.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •