Use programmable logic
G1: maintenance delayed
Then use socket function g1 for the socket in question
No support or warranty issues over PM! Please send PMs to the moderators only if you have general problems with using the forum! Thanks for helping us to keep the support efficient.
Kein Support oder Reklamationsabwicklung über PM! Bitte senden Sie an die Moderatoren nur PMs bei allgemeinen Problemen mit der Verwendung des Forums! Danke dass Sie uns dabei helfen, den Support effektiv zu gestalten.
I'm trying to delay the skimmer for 5 minutes after every maintenance, after AWC and I have a skimmate locker switch that shuts the skimmer down when full.
The following PL seems to work except the Skimmer shuts down and returns without the delay.
Skimmer delay 5 minutes:
G1 Input Filter X (Skimmer)
Time 300s
Function Delayed on
Skimmer off during AWC:
G2 Input 1 Water change [Inverted]
Input 2 Progammable logic 1
Function AND
Skimmer off when skimmate locker is full:
G3 Input 1 Digital input 1 (Pressure switch in locker)
Input 2 Progammable logic 2
Function AND
PL 3 is the input for the skimmer socket.
Is this correct? If I use "maintenace delay" on G1 I can't set it to all 4 or even 2 & 3 without using more gates. I think you can see what I'm trying to do, any suggestions?
Last edited by Halfmoon; 25.07.2014 at 20:00.
Perry
A screen shot is worth a thousand words...
Profilux 3.1N eX, 3 PAB 6D, Slave Doser, PLM-ADIN, Vortech Controller, PLM-PWC, Leak detector, 2 LX 6100HV Mitras
Controlling a 150 DSA Peninsula mixed reef.
It does get confusing when stacking gates, didn't think it would be that hard to do what I want.
Perry
A screen shot is worth a thousand words...
Profilux 3.1N eX, 3 PAB 6D, Slave Doser, PLM-ADIN, Vortech Controller, PLM-PWC, Leak detector, 2 LX 6100HV Mitras
Controlling a 150 DSA Peninsula mixed reef.
Bookmarks