We are through
Not glued yet so looks a bit wonky
Sump plumbed to tank.
The sump return line has been plumbed using 45 degrees bends to reduce the flow restriction of 90 degrees where possible.
The two drain lines have a 5% drop so there are no real dead static points that could create issues.
The return lines are now being wet tested prior to water pressure testing.
The two canisters on the wall or for GFO and Carbon.
what a shock first follow post to post and in one post we read some one says they have had differences at times and then the first line in the next post ..We are through It took a minute then I see you ment the floor.. thanks for the updates
profilux 3x wireless enabled 3 ecotech pumps and wireless adapter
3 Simuspots 2 levl sensors ( min /max)
4 channel dossing pump 2 PAB 6 outlets
Temp PH and redox sensors 2 mitras 6100HV
touch Condutivity sensor wireles card
The tank is now half full (well nearly) the RO unit even though 100gpd is struggling due to the cold water going in, my water bill is going to be insane! I replaced the cartridges prior to filling to make sure the TDS was at 0
The sump looks cloudy due to force feeding the Marco rock chips, it has had a huge dose of bacteria courtesy of Prodibio StartUp.
Bookmarks