The dosing pump can work for 15' and then it needs 15' of break.
That means that it can work 30' in 1h.
If flow rate is 60ml/min and the rate/dosing is more than 900ml (60 ml/min x 15 min -max time = 900ml) that means that the pump will work for more than 15', so it will go off some time.
So, I would like: not to be able to set a rate/dosing in PC5 (or PC6) if the amount of rate x rate/dosing makes the pump work more that 15' continuously. Or if the set can be done, automatically increase the dosing/day by what ever needed.
And an internal code so as the pump will not work for more that 15 min what ever the user wants (for example when using dosing pump in program logic). An error message will be great in case of when performing the program makes the pump work more than 15' in 30’ .
Bookmarks