Page 1 of 2 12 LastLast
Results 1 to 10 of 13

Thread: Upstart of Brezzer and need some help

  1. #1
    Join Date
    05.07.2009
    Posts
    15

    Default Upstart of Brezzer and need some help

    Someone there can help me with the reason for that I am not able to change the numbers in: "1-10V Output is maximum at deviation of"
    In Socket funcktion I have it in S5, Temp 1, chiller.
    In 1-10 interfaces I use L3, temp.1 controller.
    I have connectedthe brezzer in L3L4 back on the GHL.
    What am I doring wrong ?
    Regards,

    Maack

    ProfiLux Plus ll eX
    Doseringpump with 4 units
    propes:
    Temp
    pH
    Redox
    Cond.

    Moonlight
    Powerbar
    2 x 5 brezzers

    540 l Deltec with 180 l sump

  2. #2
    Join Date
    05.07.2009
    Posts
    15

    Default

    bump bump bump
    Regards,

    Maack

    ProfiLux Plus ll eX
    Doseringpump with 4 units
    propes:
    Temp
    pH
    Redox
    Cond.

    Moonlight
    Powerbar
    2 x 5 brezzers

    540 l Deltec with 180 l sump

  3. #3
    Join Date
    18.02.2009
    Location
    Kaiserslautern
    Posts
    7,710

    Default

    we don't understand the question

  4. #4
    Join Date
    05.07.2009
    Posts
    15

    Default

    Ok I have try on another way :-)

    I am only able to start my Probelle manually despite the fact that I have a propeller Control 2.1

    I have connected the DC plug to S5 in my powerbar and the propelle into the "controller", from there into L5 port. But by this way nothing happens.

    Extra question: Can I connect two propeller units, including two propeller control in a YL2 splitter and manage that via the GHL ?

    I hope you understand it :-)


    Regards,
    Henrik
    Regards,

    Maack

    ProfiLux Plus ll eX
    Doseringpump with 4 units
    propes:
    Temp
    pH
    Redox
    Cond.

    Moonlight
    Powerbar
    2 x 5 brezzers

    540 l Deltec with 180 l sump

  5. #5
    Join Date
    18.02.2009
    Location
    Kaiserslautern
    Posts
    7,710

    Default

    the power adaptor has to be plugged into a socket with permanent power and L5 must have the function "temp 1"

    you can connect 2 PropellerControl using a splitter

  6. #6
    Join Date
    05.07.2009
    Posts
    15

    Default

    Thanks a lot Matthias, now it work
    Regards,

    Maack

    ProfiLux Plus ll eX
    Doseringpump with 4 units
    propes:
    Temp
    pH
    Redox
    Cond.

    Moonlight
    Powerbar
    2 x 5 brezzers

    540 l Deltec with 180 l sump

  7. #7
    Join Date
    05.07.2009
    Posts
    15

    Default

    How can it be that the temperature was 23.9 degrees this morning in the tank, when GHL'n is set to 25 degrees, the propeller still driving at full when the temperature was 23.9. How do I fix that ?.

    Regards,

    Henrik
    Regards,

    Maack

    ProfiLux Plus ll eX
    Doseringpump with 4 units
    propes:
    Temp
    pH
    Redox
    Cond.

    Moonlight
    Powerbar
    2 x 5 brezzers

    540 l Deltec with 180 l sump

  8. #8
    Join Date
    18.02.2009
    Location
    Kaiserslautern
    Posts
    7,710

    Default

    please show us your settings

    screenshots of the 1-10V-settings and of the temperature settings

  9. #9
    Join Date
    05.07.2009
    Posts
    15

    Default

    Hi Matthias

    I have some problems with copy/paste so I can send the screenshots. I will get some help to that and return to you.

    Regards,

    Henrik
    Regards,

    Maack

    ProfiLux Plus ll eX
    Doseringpump with 4 units
    propes:
    Temp
    pH
    Redox
    Cond.

    Moonlight
    Powerbar
    2 x 5 brezzers

    540 l Deltec with 180 l sump

  10. #10
    Join Date
    18.02.2009
    Location
    Kaiserslautern
    Posts
    7,710

    Default

    when you want to add pictures in the forum:
    use the button "go advanced" and then add attachments

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •