I have 2 Tunze Stream 6105 one on the left and one on the right of the tank and I'd like them to work separately for 2 minutes starting from minimum power arriving maximum power.Could you please send me screenshoots for this setting?Thank you.
I have 2 Tunze Stream 6105 one on the left and one on the right of the tank and I'd like them to work separately for 2 minutes starting from minimum power arriving maximum power.Could you please send me screenshoots for this setting?Thank you.
for example like this:
tunze.jpg
of course these settings have to be finetuned for your needs
don't forget to set the function of the 2 1-10V-interfaces (e.g. L1 and L2 or L3 and L4) to "current pump 1" and "current pump 2"
and to set the min voltage to 3v and max to 8v
offcourse you can.
I've been doing that since I got my p3 ex
the voltage is set in PLC in System > 1-10V Iterface
For some reason my 2 pumps wouldnt work on Sequence 1 or 2. they only work on permanet or perm opposite mode. what could be possably wrong?
when i set on Sequence 1 i can see state is counting % but, pumps are dead.
Bookmarks