Results 1 to 3 of 3

Thread: Current pumps and feed pause

  1. #1
    Join Date
    30.08.2022
    Posts
    15

    Default Current pumps and feed pause

    Hi guys,

    I have 2 current pumps from tunze. They are on socket 1 and 2. Both off them are on a different timer function.

    How can i program so that when feed pause is activated, both pumps shut down, and when feed pause is finished both timer functions are reactivated.

  2. #2
    Join Date
    10.01.2020
    Posts
    147

    Default

    Hi,

    set the Switch Channel to programmable logic and the programmable logic to:
    Input 1:
    Function: Filter, Functional parameter: number of your feed pause
    Operator:
    AND
    Input 2:
    Function: Timer, Functional Parameter: number of the Timer

    Kind regards
    Volker

  3. #3
    Join Date
    30.08.2022
    Posts
    15

    Default

    Thank you so much.. what a great and helpfull community!!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •