I've bought a magnetic stirrer model 2 for channel 4 of my doser 2.1.

I only want it to run 2 times a day. So not a specific time before dosing.

Would it work if i left the fields in activate by dosing pumps or switch channel and index at ---.

and only fill in the fields activate automatically in cycles : stir cycles per day 2, duration 60 and speed at 7?

thanks