Results 1 to 3 of 3

Thread: ION director using wrong dosing pump?

  1. #1
    Join Date
    12.02.2022
    Location
    Oslo
    Posts
    1

    Default ION director using wrong dosing pump?

    Hello!

    I am very exited to get my ION director up and running. The problem is when I push "prepare measuring cell" the 4th dosing pump connected to my KH director starts running. This caused some issues since this is used for dosing alk.

    How can I get the ION director to use the right dosing pump?

    I have disconnected the KH director, then noting happens until pump 2 and 3 connected to the IOND starts.

    Best regards

    Kenneth

  2. #2
    Join Date
    27.05.2015
    Posts
    2,498

    Default

    Hi Kenneth,

    First check to see that you are using the latest firmware version for your master device. The SA Doser is currently on 1.40 and P4 is on 7.28.

    Once confirmed, you can check you pump head assignment to see that your IOND pump heads are assigned in the PAB system as 5-8 (assuming your first pump managing the KHD is already set to 1-4).
    No support or warranty issues over PM!
    Please send PMs to the moderators only if you have general problems with using the forum! Thanks for helping us to keep the support efficient.

    Creating a support ticket
    For support or warranty issues, create a support ticket by clicking here.

  3. #3
    Join Date
    27.05.2015
    Posts
    2,498

    Default

    The current version of GCC can be found here:
    https://www.aquariumcomputer.com/dow...nter-v1-1-3-7/
    No support or warranty issues over PM!
    Please send PMs to the moderators only if you have general problems with using the forum! Thanks for helping us to keep the support efficient.

    Creating a support ticket
    For support or warranty issues, create a support ticket by clicking here.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •