Hi,
Depending on the type of power heads you want to control, you may be able to skip the powerbar all-together.
For ON / OFF switching control, the powerbar would be needed upstairs. To do that, you'd need to run a single PAB cable from the basement to the display tank.
If you are running Tunze controllable pumps, you will not need a Powerbar. Instead, you would use a YL2-splitter cable long enough to run to the upstairs. From that splitter, you'd connect one or two GHL Tunze cables. These cables connect to the pump driver.
For Vortech MP pump control, no Powerbar needed. Just run a single PAB cable upstairs and connect a GHL Vortech Controller acccessory to it. That accessory will then wirelessly control multiple Vortech pumps.
Bookmarks