-
alternating power head configuration
I have a profilux 3 which are currently controlling 2 x Tunze powerheads in 1 stream group configuration.
I also have a Gyre 250 that i have scheduled to turn on for 5 mins on the hour.
What i would like to be able to do is turn the stream group off at the time the power head turns on, stay off for 5 mins, then turn back on.
Can anyone point me in the right direction to do this?
Thanks
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Bookmarks