Zeige Ergebnis 1 bis 5 von 5

Thema: alternating power head configuration

  1. #1
    Registriert seit
    07.06.2015
    Beiträge
    56

    Standard alternating power head configuration

    I have a profilux 3 which are currently controlling 2 x Tunze powerheads in 1 stream group configuration.
    I also have a Gyre 250 that i have scheduled to turn on for 5 mins on the hour.

    What i would like to be able to do is turn the stream group off at the time the power head turns on, stay off for 5 mins, then turn back on.

    Can anyone point me in the right direction to do this?

    Thanks

  2. #2
    Registriert seit
    27.05.2015
    Beiträge
    1.594

    Standard

    Have you tried using the SEQUENCE flow mode?

    If you put all pumps in 1 group, each pump will react one-by-one.

  3. #3
    Registriert seit
    07.06.2015
    Beiträge
    56

    Standard

    I don't have the controller interface for the gyre so I'm assuming I can only use it on a timer and not in a sequence?

  4. #4
    Registriert seit
    27.05.2015
    Beiträge
    1.594

    Standard

    How is the gyre currently connected to the P4?

  5. #5
    Registriert seit
    07.06.2015
    Beiträge
    56

    Standard

    Just plugged into the PAB and on a timer to run for 5mins every hour.

Forumregeln

  • Es ist dir nicht erlaubt, neue Themen zu verfassen.
  • Es ist dir nicht erlaubt, auf Beiträge zu antworten.
  • Es ist dir nicht erlaubt, Anhänge hochzuladen.
  • Es ist dir nicht erlaubt, deine Beiträge zu bearbeiten.
  •