Results 1 to 5 of 5

Thread: alternating power head configuration

  1. #1
    Join Date
    07.06.2015
    Posts
    61

    Default alternating power head configuration

    I have a profilux 3 which are currently controlling 2 x Tunze powerheads in 1 stream group configuration.
    I also have a Gyre 250 that i have scheduled to turn on for 5 mins on the hour.

    What i would like to be able to do is turn the stream group off at the time the power head turns on, stay off for 5 mins, then turn back on.

    Can anyone point me in the right direction to do this?

    Thanks

  2. #2
    Join Date
    27.05.2015
    Posts
    2,498

    Default

    Have you tried using the SEQUENCE flow mode?

    If you put all pumps in 1 group, each pump will react one-by-one.

  3. #3
    Join Date
    07.06.2015
    Posts
    61

    Default

    I don't have the controller interface for the gyre so I'm assuming I can only use it on a timer and not in a sequence?

  4. #4
    Join Date
    27.05.2015
    Posts
    2,498

    Default

    How is the gyre currently connected to the P4?

  5. #5
    Join Date
    07.06.2015
    Posts
    61

    Default

    Just plugged into the PAB and on a timer to run for 5mins every hour.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •