-
Do I only need the Doser 2 now?
If I don't need to control lights, is the Doser 2 all I need now since it can control the power bar and level sensors? Can the doser do Feed Pause?
I just need:
1. ATO
2. Socket Switching (how many 5.1 Powerboats can I daisy chain?).
3. Chiller/heater control
Thanks!
-
Hi Shaggss,
The Doser 2 at the moment has the ATO function enabled. It does not have a feed mode option.
Last edited by Vinny; 10.07.2015 at 06:15.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Bookmarks