Need some help here..
1. Return pump is powered by a separate power strip (non GHL power bar)
2. Return pump connected to P4 via 0-10v port
3. Skimmer on powerbar socket
Trying to do the...
Type: Posts; User: schaNYC
Need some help here..
1. Return pump is powered by a separate power strip (non GHL power bar)
2. Return pump connected to P4 via 0-10v port
3. Skimmer on powerbar socket
Trying to do the...
Thanks for the reply. I was under the impression that I needed to use PL since I already have an assignment for Socket 3 and that would be the only way to apply 2 functions to the same socket (so...
I think I may have figured out. How does this look?
Programmable logic combining the Auto top off and Leakage detection with AND statement.
12402
12403
Brand new to this and having trouble with setting up this logic.
S3: Fill water (ATO only) mapped to control circuit 1 (Auto top off)
I want to have low level sensor in RODI container (I have...