1- aeration of KHD solution tube. First disconnect from KHD and fill tubing using manual pump controls until it is full ie including the short pipe out of the doser head; then connect to KHD (correct?)
2-the sample measurement is the total of the tubing from the tank to where it connects to the white doser head pipe + the length of the tubing between the doser and the KHD. Do you also have to add to the length of the white doser head tubing too? If so what is this measurements as it must be standard?
3- before venting, flushing, emtying completely “all pumps used for measuring must be assigned,adjusted and calibrated!”. “Assigned” is simple; “adjusted” -assume this means set to fast (sample in/out) and slow for reagent??? “Calibrated” assume this means just putting in the length of the sample tubing..?? Or must I calibrate the doser heads like I would normally..??
4- Do I assign pumps, set pump speed, aerate tube an reconnect, calibrate PH probe, install ph probe, enter pipe dimensions, then vent KHD- in that order?