Zeige Ergebnis 1 bis 6 von 6

Thema: KH Director planned features

  1. #1
    Registriert seit
    18.02.2009
    Ort
    Kaiserslautern
    Beiträge
    7.342

    Standard KH Director planned features

    In the current firmware for ProfiLux 3/4 and GHL Doser, we have concentrated on reliable measurements and a high level of reliability and safety.

    In the meantime, we already received some feature requests, so here is a brief summary of what is planned in the next versions:

    - Measured value recording / curves for P3 and Doser, in myGHL and GCC
    - Switch off automatic refilling during measuring process
    - Automatic refill (salt) water after measurement
    - Checking the measurement result for plausibility, if value seems to be not right automatic remeasurement and correction if required

    We will continue to observe how the KH Director works in the field, which additional functions make sense, where changes are necessary and, if necessary, provide timely updates.
    No support or warranty issues over PM! Please send PMs to the moderators only if you have general problems with using the forum! Thanks for helping us to keep the support efficient.
    Kein Support oder Reklamationsabwicklung über PM! Bitte senden Sie an die Moderatoren nur PMs bei allgemeinen Problemen mit der Verwendung des Forums! Danke dass Sie uns dabei helfen, den Support effektiv zu gestalten.

  2. #2
    Registriert seit
    30.04.2010
    Beiträge
    148

    Standard

    Would it be possible to add a KH manual test button on the Profilux touch?

  3. #3
    Registriert seit
    04.11.2015
    Beiträge
    318

    Standard

    Zitat Zitat von gino555 Beitrag anzeigen
    Would it be possible to add a KH manual test button on the Profilux touch?
    This should be possible. I will forward this.
    No support or warranty issues over PM! Please send PMs to the moderators only if you have general problems with using the forum! Thanks for helping us to keep the support efficient.
    Kein Support oder Reklamationsabwicklung über PM! Bitte senden Sie an die Moderatoren nur PMs bei allgemeinen Problemen mit der Verwendung des Forums! Danke dass Sie uns dabei helfen, den Support effektiv zu gestalten.

  4. #4
    Registriert seit
    10.10.2013
    Beiträge
    213

    Standard

    Hello,

    The possibility of designate a level sensor to suspend KHD measurements should be added.
    In my case for exemple, for reasons of space and having no waste water pipe, the rejection of the KHD is done in the skimmer cup.
    I have a level sensor on the skimmer cup that automatically turns off the skimmer. In revenche I have no way to suspend the KHD and I would not want the waste water goes into the tank...
    I can not use the dosing pump fill meter because it does not take into account the filling by the scum.
    Matthias, could you add the ability to choose one of the level sensors that would suspend KHD execution in the same way that khd is suspended if the level of reagent is too low?

    If using a level port for this is difficult or inapropriate for you, maybe you can add a PLM-ADIN option for "Suspend KH Director measurements" in thi case i will add another level sensor like this connected to one input of ADIN?


    You think it's possible Matthias?

    Thank

  5. #5
    Registriert seit
    29.12.2016
    Beiträge
    13

    Standard

    My suggestions are simple ones:
    A colour coordinated stand the same size as the doser/KHD to lift it up slightly s

  6. #6
    Registriert seit
    29.12.2016
    Beiträge
    13

    Standard Sorry battery went dead before posting

    Zitat Zitat von JamesD Beitrag anzeigen
    My suggestions are simple ones:
    A colour coordinated stand the same size as the doser/KHD to lift it up slightly s
    I haven’t used it long enough but having recently set it up I have a few suggestions for accessories
    1-Branded dosing containers for reagent and waste/overflow-waste being much bigger than the reagent container. With a pipe on the reagent that goes to the bottom and two on the waste as I’m told these tubes should not sit in the waste.
    2-Something like a red rubber band on the 24v supply so you don’t accidentally mix up with the 12v P4 supply
    3-coloured matched clips to click doser, KHD units etc together
    4-a coloured match shelf/stand to go under the doser with a cantilever so the dosing pipes hang freely
    5-a bit more detail in the instructions on how to calibrate the doser and what order everything should be done in
    6- as an aside, as this is another GHL device that is going to report warnings, but is often kept in a cupboard, I would love to be able to have the separate GHL screen change background colour in the shame way the devices do, so you can see a warning without having to go up to it and read it.
    Oh of course I look forward to it reading Ca Mg etc...
    Saying all the above, so far I’m impressed!

Forumregeln

  • Es ist dir nicht erlaubt, neue Themen zu verfassen.
  • Es ist dir nicht erlaubt, auf Beiträge zu antworten.
  • Es ist dir nicht erlaubt, Anhänge hochzuladen.
  • Es ist dir nicht erlaubt, deine Beiträge zu bearbeiten.
  •